The lighting of the renovation project of Narita Airport will also be replaced by LED lighting.

According to (NHK) reported on the 24th, in order to meet the 2020 Tokyo Olympic Games, Japan Narita Airport will start the renovation of Terminal 2 in September. The renovated Terminal 2 will be more Japanese, with a view to deepening the impression of overseas visitors on Japan.

The Narita Airport Terminal 2, which was opened in 1992, has not been extensively renovated in 22 years and has remained the same. The key renovations were the “arrival entrance” on the first floor and the basement level. The arrival port will be transformed into a traditional Japanese sliding door style. In the reconstructed Terminal 2, the overall color will change from gray to white, and the lights will be replaced with LED lighting.

It is reported that the renovation of Terminal 2 is expected to be completed in the spring of 2016, with a total project budget of approximately 900 million yen. According to the introduction of Narita Airport, the renovation project of Terminal 1 will also be launched.


DELIGHT All-In-One series integrated Solar Street Light. All in one design 
Mono Solar Panel, led lamp, Lithium Battery and Controller all in a box 
Put the lamp on pole and tighten screws, then it works 
No need any cable, easy maintenance 
With PIR motion sensor, full power output if any motion, other time is 30% 
For public lighting: gardens, park, beaches, roads, farm, walking street, car paring, etc

Integral design, without extra cable, easy to ship, installation and maintenance. Powered by solar power energy, environment friendly. Bridgelux chip, ultra-bright with mention sensor + smart phone APP, intelligent and energy saving.


All-In-One Solar Street Light

All-In-One Street Light,All In One Solar Street Light,All-In-One Solar Led Street Light,All-In-One Solar Street Light

Delight Eco Energy Supplies Co., Ltd. , https://www.cndelight.com