State Grid Jilin Province Electric Power Co., Ltd. Tonghua Power Supply Co., Ltd. 2016 Tongji Highway Power Facilities Modification Design Bidding

The tender number: BTZB-GCSJ-16130-01

State Grid Jilin Electric Power Co., Ltd. Tonghua Power Supply Company
2016 Tender Notice on the Design and Modification of Tongji Expressway Power Facilities
Tender conditions
The project construction unit of this bidding project is State Grid Jilin Province Electric Power Co., Ltd. Tonghua Power Supply Company (hereinafter referred to as “the project unit”), the construction fund is self-raised 100%, and the bidder is Guohua Jilin Province Electric Power Co., Ltd. Tonghua Power Supply Company. Carry out related project design bidding and procurement activities. The project has already met the conditions for bidding and the public bidding for the design of the batch of projects is now underway.
2. Project overview and scope of tender
Construction site: Tonghua Ji’an City.
Construction Scale: State Grid Jilin Province Electric Power Co., Ltd. Tonghua Power Supply Co., Ltd. 2016 Tongji highway power facilities renovation project design tender.
Scope of the tender: preparation of feasibility study report; preliminary design, construction drawing design, etc. (including details of withdrawal of old materials; design of transitional plans); preparation of inventory of material procurement that meets ERP system requirements and meets material procurement standards; preparation of equipment bidding technical specifications; Preparation of bill of quantities and construction drawings; Compilation of as-built drawings; On-site service and necessary survey work.
Package No. Project Name Construction Site Bidding Control Price (RMB 10,000)
1 Compensation and Removal Engineering of Tongji Expressway Power Facilities (220kV Part) Ji'an City, Tonghua City 139.0000
2 Compensation for the removal of power facilities of Tongji Expressway (part of 66kV Jinqingjia Line and 66kV Jinqingyi Line) Ji'an City, Tonghua City 100.0000
3 Tongji Highway Power Facilities Dismantlement Compensation Project (66kV Jiapi Part A, 66kV Qinghuajiao, 66kV Qinghuayi, 66kV Yuzigou Branch) Ji'an 39.0000 Tonghua City
Duration: Within 15 days after the signing of the contract, preliminary design and delivery; construction drawing design shall be delivered within 15 days after the preliminary design document is approved; the as-built drawing shall be delivered within 30 days after the project is put into operation.
The project quality requirements: up to standard production, meet the design requirements, and meet the construction conditions, the overall quality to achieve excellent standards.
3. Bidder qualification requirements
3.1 The bid requires the bidder to have:
Package 1: It is registered in the territory of the People's Republic of China and has the qualifications of Class B and above in power engineering design issued by the State Construction Administration Department.
Packages 2 and 3 are registered in the territory of the People's Republic of China and have the qualifications of Class C and above for power engineering design issued by the State Construction Administration Department.
3.2 Performance requirements: There are 3 similar project achievements in the past three years.
3.3 Whether to allow the Commonwealth bid: □ Yes √ No
4. Acquisition of tender documents
4.1 Any interested bidder should bring a copy of the tax registration certificate, business license, and account opening permit (copy) from December 30, 2016 to January 6, 2017 (excluding legal holidays, statutory holidays, etc.)